摘 要:北京地铁8号线天桥—永定门外区间盾构接收端头处隧道埋深较大,且含有富水砂卵石地层,盾构到达时发生涌砂涌水的风险较大,因此对此端头井进行了加固方案设计。首先通过比选确定了加固方法;然后按照理论计算和经验类比确定了加固范围;最后通过理论计算和数值模拟对降水方案进行了设计,可为今后同类工程的设计和施工起到一定的借鉴作用。The tunnel section of shield end from Tianqiao-Yongdingmenwai of Beijing Metro Line 8 is deeply buried and contains water-rich sandy cobble stratum. In order to reduce the risk of gushing water and sandstone when the shield arrives, a soil reinforcement scheme is designed. Firstly, the way to reinforce is determined by comparing different methods; then according to theoretical calculation and experience analogy, the scope of soil reinforcement is obtained; finally, precipitation scheme is presented through theoretical calculation and numerical simulation. The results can provide reference for future design and construction of similar projects.
关 键 词:砂卵石地层 端头加固 旋喷桩 加固范围 降水方案
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15