建筑物物化阶段碳足迹快速计算模型研究  被引量:8

Research on Carbon Footprint Fast Accounting Model for Building Construction Phase

在线阅读下载全文

作  者:李静[1] 包昀培 

机构地区:[1]大连理工大学,辽宁大连116024

出  处:《建筑经济》2016年第8期87-91,共5页Construction Economy

摘  要:将物化阶段温室气体排放归结为建筑材料、施工机械、运输等三大碳足迹来源,以其构成建筑物物化阶段碳足迹,并基于BIM技术及《建筑工程消耗量定额》获取建筑的材料及机械工程量清单,运用碳足迹因子法计算三类碳足迹,形成建筑物物化阶段碳足迹计算快速模型。结合案例验证模型的正确性与可信性。This paper divides the source of greenhouse gas into three sources:building material carbon footprint,construction machinery carbon footprint,and transportation carbon footprint,to form the carbon footprint of the buildings during its construction phase. Then,based on BIM technology and the Building Construction Consumption Quota to obtain the bill of material and machinery quantities,calculates the three kinds of carbon footprints with the method of carbon footprint factors,forms the carbon footprint fast accounting model. Finally,verifies the accuracy and credibility of the established model by combining the actual example.

关 键 词:BIM技术 碳足迹 建筑物化阶段 快速计算 

分 类 号:F407.9[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象