检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡国平[1,2] 王姣[1,2] 严卓[1,3] 周清勇
机构地区:[1]江西省水利科学研究院,江西南昌330029 [2]江西省水工安全工程技术研究中心,江西南昌330029 [3]河海大学水利水电学院,江苏南京210098
出 处:《江西水利科技》2016年第2期79-82,共4页Jiangxi Hydraulic Science & Technology
摘 要:本文通过三维有限元对比分析,随着闸门启闭方式改变、闸墩上部加固改造后闸墩的各部位最大拉、压应力值及应力分布均相比加固前有较大变化,尤其是在牛腿、闸墩新老混凝土及液压杆支绞座处等应力明显集中、增大,计算结果可为溢流坝段的安全运行提供技术支撑.Through 3D finite element comparative analysis, this paper finds out that after reinforcement and changing the way of opening and closing, the largest tensile and compressive stress and the stress distribution in the pier changes a lot. Especially in the bracket, new and old concrete and the ground base of hydraulic lever, the stress concentrates and increases obviously. The calculation results can provide technical support for safe operation of the overflow dam.
分 类 号:TV662.2[水利工程—水利水电工程] O241.82[理学—计算数学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.79.92