检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交公路规划设计院有限公司,北京市100088 [2]中路建交通规划有限公司,北京市100088
出 处:《公路》2016年第8期228-232,共5页Highway
摘 要:针对青岛地铁首次采用TBM掘进施工,为保障施工安全和工期,根据不同站位支撑高度,分别介绍了TBM掘进区间的始发站和中间站预留洞口钢架支撑方案。通过合理的设计以及施工措施保障,本支撑方案已经达到预期设计结果,为总体工筹目标的实现创造有利条件,也为今后相关工程提供参考。It is the first time to use TBM method for construction of subway in Qingdao, to ensure the construction safety and construction period, according to the different stations supporting height, reserved hole steel support schemes for TBM tunneling interval originating and intermediate station are respectively introduced. Through reasonable design and construction measures, the support scheme has achieved the expected design results, which has created favorable conditions for the realization of the overall industry, and provided reference for the related projects in the future.
分 类 号:U455.7[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3