检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学土木工程学院,上海200092 [2]上海绿地科技岛置业有限公司,上海200335
出 处:《同济大学学报(自然科学版)》2016年第8期1182-1189,共8页Journal of Tongji University:Natural Science
基 金:国家自然科学基金(51378382)
摘 要:提出在胶合木结构中采用预应力方套管螺栓连接,该连接采用高强螺栓和钢套管作为连接件.通过单调加载和往复加载下的梁柱节点抗弯试验,对比了方套管节点和传统螺栓群连接节点的破坏模式、弯矩-转角曲线、滞回曲线、强度、刚度和耗能性能.结果表明,由于摩擦阶段钢管与钢板间的摩擦力确保了初始传力,套管节点的初始转动刚度显著提升,耗能能力也得到改善.This paper presents an experimental study on the moment resisting capacity and stiffness of the proposed pre- stressed bolted connection. High-strength bolts with square tubes were used as fasteners in such connections. Two groups of experimental tests were conducted with T-shaped glulam beam-to-column connections at monotonic and reversed cyclic loading. The failure mode, moment-rotation curve, strength, stiffness and energy dissipation property of the pre-stressed bolted connections with square tubes were obtained and compared with those of traditional bolted connections. The results show that the initial rotational stiffness of pre-stressed bolted connection increases significantly as a result of the friction between steel tubes and steel plate at the friction stage, and the energy dissipation capacity of pre-stressed bolted connection is also improved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28