检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国中铁二院工程集团有限责任公司,成都610031
出 处:《路基工程》2016年第5期150-153,共4页Subgrade Engineering
摘 要:渝怀铁路K562+739^+805路基左侧分布12根抗滑桩,其中10根抗滑桩桩身出现不同宽度及深度的裂缝。经现场调查并采用低应变反射波法、地质雷达法对桩身裂缝及桩体完整性检测分析,裂缝原因主要是由于抗滑桩外挂式挡土板与桩体连接不牢固,导致桩体的锁口参与受力,锁口部位受力过大所致,应采用在每个抗滑桩中对应各自每块挡板位置补打锚索的处理措施。There are 12 anti-slide piles distributed along the left side of subgrade for K562+739~+805 section of Chongqing-Huaihua Railway, wherein the 10 piles have cracks in different width and depth on the body. By means of field investigation, low-strain reflection wave and GPR, these cracks were detected and the pile integrity analyzed. It was found that the outboard retaining plate and the pile have so insecure connection that the pile lock is under stress to a great extent; and this was the reason. The treatment measure was to add anchor cable at the position of each retaining plate for every pile.
关 键 词:铁路路基 抗滑桩 地质雷达 低应变反射波 裂缝成因
分 类 号:U213.152.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43