检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《山西建筑》2016年第30期223-225,共3页Shanxi Architecture
基 金:北京市教育委员会科技计划项目资助(项目编号:KM201610009010)
摘 要:从建设项目团队冲突管理理论入手,分析了北京某定向安置房项目实施过程中团队冲突管理情况,了解在该项目中团队冲突的形式和成因,并利用相关性分析和回归分析模型,探讨了不同团队冲突管理方式对团队效率的影响,进而提出了建设项目中团队冲突管理的有效意见,倡导团队建立和谐的秩序,促进我国工程建设行业朝着科学化管理迈进。From the theory of construction project team conflict management,this paper analyzed the team conflict management situation of a oriented resettlement housing project implementation process in Beijing,understood the forms and causes in the project team conflict,and used the correlation analysis and regression analysis model,discussed the influence of different team conflict management ways to team efficiency,then put forward the effective opinions of team conflict management in construction project,advocated the team to establish harmonious order,promoted China's engineering construction industry toward scientific management.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.176