检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州交通大学土木工程学院,甘肃兰州730070 [2]道桥工程灾害防治技术国家地方联合工程实验室,甘肃兰州730070
出 处:《铁道建筑》2016年第10期42-45,共4页Railway Engineering
基 金:长江学者和创新团队发展计划(IRT15R29)
摘 要:新建兰州至乌鲁木齐第2客运专线,是世界上首条穿越大风区的高速铁路,设置合理可靠的挡风结构对于其运输安全有重大意义。本文依据钢筋混凝土结构计算的假设理论和计算方法,结合挡风板的受力特点,推导出挡风板的开裂弯矩、开裂时最大风荷载和跨中挠度计算公式,并采用合理的加载方式,对挡风板进行静载开裂破坏试验。试验值与计算值之间的对比结果表明,本文推导公式有较好精度,现场试验应用效果良好。An new second passenger dedicated railway cross Lanzhou to Urumqi is the world's first high speed railway crossing wind region,so setting reasonable and reliable wind structure for transport safety is of great significance.Based on the theory and calculation method of the calculation of reinforced concrete structure,combined with the force characteristics of the wind shield,the formulae for calculating the cracking moment,maximum wind load and the mid-span deflection of the wind shield were derived.The test of static cracking and failure of the windshield was carried out by using the reasonable loading method.The comparison between the measured and calculated results show that the formulae have a better precision field test has good effect.
分 类 号:U213.154[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249