检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省水文水资源勘测局盐城分局,江苏盐城224051 [2]南京水利科学研究院,江苏南京210024 [3]水文水资源与水利工程科学国家重点实验室,江苏南京210098
出 处:《水运工程》2016年第11期134-139,共6页Port & Waterway Engineering
基 金:国家自然科学基金资助项目(51309160)
摘 要:采用二维水动力数值模拟,计算桥梁修建前后的水流条件的变化,分析其对九圩港河道通航和引、排水的影响。计算结果表明:桥梁建设没有恶化通航水流条件,并满足通航净高要求,但在水位较低时无法满足通航净宽要求;桥梁建设引起的近岸流速的增大可能对近岸产生不利冲刷。采取疏浚清淤平顺岸线的改善措施以及护岸加固可以减小桥梁建设可能引起的不利风险。This paper analyzes the influence on the functions for navigation, water diversion and drainage ofJiuweigang river caused by the construction of the proposed bridge by 2D numerical simulation model. The mainconclusions are: 1)The impact of the bridge construction on the navigable flow conditions would be minimal and thenavigable clearance height would meet the demand, but the navigable clearance width wouldn't meet the demandwhen the water level is low; 2) More attention should be paid to the safety of the right bank of the river for theincreasing flow velocity.The impact of the piers should be decreased by some optimized improvement measures.
分 类 号:U612[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117