检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李春生[1]
机构地区:[1]铁道第三勘察设计院集团有限公司工经处,天津300142
出 处:《铁路工程技术与经济》2016年第6期5-7,12,共4页Railway Engineering Technology and Economy
摘 要:随着铁路网结构和国家能源政策的调整,既有铁路电气化改造将成为"十三五"期间铁路建设的重点,以及设计单位的重要工作。此文在阐述电气化改造工程施工组织设计具有几项特点的基础上,针对施工区段划分、主要工程的施工方法、施工过渡方案及措施、分段分期施工方案及工期的确定、合理确定工程造价等施工组织设计中的几个关键问题进行论述,以此确定设计原则和方法,来编制施工组织设计。With the adjustment of railway network structure and national energy policy, transformation of existing electrified railway will become the focus of railway construction during the period of 13th Five - Year Plan, and will also be an important work of the design unit. Based on the elaboration of characteristics of construction organization design of electrical reconstruction project, the following several key issues are discussed to determine design principles and methods and prepare construction organization design: the division of construction sector, the construction method, the construction transition plan and measures, staged construction scheme, confirming construction cost rationally and so on.
分 类 号:U22[交通运输工程—道路与铁道工程] TU2[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117