检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江涛[1]
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《路基工程》2016年第6期184-187,共4页Subgrade Engineering
摘 要:铁路在经过深路堑地段时,往往对边坡处理和运营安全提出了较高要求。结合西康复线深路堑边坡处理工程实例,梳理了预应力桩板墙的加固机理与设计,阐述了预应力锚索桩板墙在该地段的应用。结果表明:预应力桩板墙在铁路深路堑边坡处理工程中效果较好,经济效益明显。Railway tends to make request on slope treatment and operation safety when it passes through the section of deep cutting. Combined with an example of deep cutting slope treatment on Xi'an--Ankang double track railway, the reinforcement mechanism and design of prestressed slab-pile wall was sorted out, then the application of the wall in this section was described. The result shows that the application of prestressed cable slab-pile wall has good effect on deep cutting slope treatment on railway with significant economic benefit.
分 类 号:U213.12[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15