检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]招商局重庆交通科研设计院有限公司,重庆400067
出 处:《公路交通技术》2016年第6期47-51,共5页Technology of Highway and Transport
基 金:交通运输部建设科技项目(2013318223380)
摘 要:结合既有工程经验,基于无应力状态理论,对重庆郭家沱长江大桥主梁安装提出多种比较方案。通过对施工阶段弦杆、吊杆的内力及应力规律的比较,以及对临时铰合龙措施的探讨,研究各方案的优劣性,并结合技术难度、施工周期、施工成本等因素,对该桥施工方案提出合理化建议。In this paper,based on the experience of the existing engineering and the stress-free state theory,some comparison scheme was put forward for the installation of the main girder of Chongqing Guojiatuo Yangtze River Bridge. Through comparing the law of internal force and stress of the chord and boom in the construction stage and discussing the measures of temporary hinge jointing,this paper discusses the advantages and disadvantages of various schemes,and puts forward some rational suggestions on the construction scheme of the bridge considering the technical difficulty,construction period and construction cost.
分 类 号:U448.25[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3