检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团华东勘测设计研究院有限公司,杭州311122
出 处:《西北水电》2016年第6期17-21,共5页Northwest Hydropower
摘 要:基于"新奥法"的基本原理,结合地质条件分析,归纳出山岭隧道4种常见的塌方模型。根据施工过程中塌方的成因及形态,分为2类,即承载拱塌方、松散体塌方,给出了相应的处理原则。以某工程隧道塌方治理为案例,按"稳固后方、超前注浆、分步开挖、加强支护"的原则,顺利通过塌方段。Based on the principle of New Austrian Tunneling Method and in combination with analysis on the geological conditions, four models of collapse often occurring in mountain tunnel are concluded. According to causes and types of collapses during construction, collapses are classified two types: bearing arch collapse and loose mass collapse. Accordingly, corresponding treatment principles are proposed. With case of the collapse treatment in one tunnel, the principles of reinforcing the tunneled section, grouting in advance, excavating in step and strengthening support are followed so that the collapse sections are passed over.
分 类 号:U458[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3