检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州地铁设计研究院有限公司,广州510000
出 处:《都市快轨交通》2017年第1期65-69,共5页Urban Rapid Rail Transit
摘 要:随着地铁线网的加密以及客流的快速增长,在工程建设中,出现了越来越多的客流大、编组长、换乘线路多的大规模车站,共用站厅超规范的5 000 m2不可避免。经过分析认为,地铁规范关于"换乘车站共用站厅不超5 000 m2"只适用6B编组的两线换乘车站,通过对不同编组、不同数量换乘线路的换乘车站站厅规模的研究,以及对其他城市实际案例调研分析,从保证消防安全的角度探讨更适应实际工程设计的规模标准,提出大面积车站应加强消防措施。Many large subway stations, which can handle large passenger flows, longer train marshalling, and multiple transfer lines, have been built in order to accommodate the rising passenger numbers and the increase of subway lines. As a result, the shared station hall covers an area of over 5,000 square meters, exceeding the allowed standard. Research indicates that the regu- lation that "the area of a shared station hall space should not be larger than 5,000 square meters" is only applicable to the double line transfer station which has 6B train marshalling scheme. The sizes of the station halls of different transfer stations with differ- ent numbers of lines and different marshalling schemes are examined and case studies in different cities are conducted. A more applicable area standard for the station hall is discussed in terms of fire protection. It is proposed that fire protection should be strengthened for the large subway stations.
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74