检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘文生[1] 吴作启[2,3] 李凡月 崔铁军[5]
机构地区:[1]辽宁工程技术大学土木与交通学院,辽宁阜新123000 [2]煤炭科学技术研究院有限公司安全分院,北京100013 [3]煤炭资源高效开采与洁净利用国家重点实验室(煤炭科学研究总院),北京100013 [4]中冶集团武汉勘察研究院有限公司,武汉430000 [5]辽宁工程技术大学安全科学与工程学院,辽宁阜新123000
出 处:《安全与环境学报》2017年第1期54-58,共5页Journal of Safety and Environment
基 金:国家自然科学基金项目(51274111)
摘 要:为了解释采空区影响下火成岩断裂破坏诱发地表裂缝的形成原因,通过建立两种采动影响下的火成岩断裂物理力学模型,推导出采动影响下火成岩初次断裂和周期性断裂判据。结合铁法晓南矿开采出现的地表裂缝,分析了火成岩断裂破坏机理,并对火成岩断裂破坏进行了预测。通过与现场实测地表裂缝位置加以验证,证明了所建力学模型的可靠性,并给出了后续生产中关于地表裂缝的规避性建议。The objective of this paper is to explore the likely factors accounting for the surface fracture induced by the igneous rock failure of the goaf in hoping to disclose the fracture mechanism of such rocks overlying the mining area and provide the needed technological supports.It is for the said purpose that we have established models of properly supported beams and cantilever beams to infer the mechanism lying behind the initial fracture and the cyclical fracture of igneous rock.And,then,we have worked out the distribution regularity of the internal strain and stress in case of the lingering igneous rocks via calculating the safety hanging length of the igneous rock in different distributive positions between the igneous rocks and the goaf.Take the surface crack that is taking place in NO.2 west mining area of Tie Fa Xiao Nan mine for example,we have worked out the scope affected by the goaf with the possibility integral method.The results of our exploration show that the igneous rock has been hollowed partially under the impact of the goaf,which has been proved in accord with the preconditions of the calculation model.Furthermore,we have also worked out the distance of the initial fracture and the cyclical fracture in the igneous rock with the aforementioned theories and methods.The results of our investigation and calculation show that the distance of the initial fracture is 224 meters whereas the distance of the cyclical fracture stands for 64 meters.As compared with the theoretical calculation results with the actual measured data on the spot,the preconditions of the calculation model of the mechanical model of the different distributive positions turns our to be correct and available,which helps us to disclose the reason accounting for the said surface crack is that the lingering length of near-surface igneous rock exceeded the safety lingering limit,which in turn leads to the near-surface rock fracture and the surface soil subsidy.Such a kind of danger area can be forecast and prevented by necessary preventi
关 键 词:安全工程 地表裂缝 开采沉陷 火成岩断裂 灾害防治
分 类 号:X45[环境科学与工程—灾害防治]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222