11000m^3耙吸式挖泥船动力系统模拟改装  被引量:2

Simulation Retrofitting of Power System in 11000m^3 Trailing Suction Hopper Dredger

在线阅读下载全文

作  者:刘乐[1] 高海波[1] 缪光辉 孙震 

机构地区:[1]武汉理工大学能源与动力工程学院,武汉430063

出  处:《船海工程》2017年第2期166-169,共4页Ship & Ocean Engineering

基  金:国家自然科学基金(51579200)

摘  要:为了实现节能减排的目的,对某传统的耙吸式挖泥船动力系统进行混合动力系统模拟改装,使用柴油机和蓄电池作为混合动力源,采用阈值法作为能量管理策略,根据不同的功率需求及蓄电池的荷电状态调整系统的工作模式,并在Matlab/Simulink环境下建立动力系统的燃油消耗及排放模型。仿真结果表明,混合动力系统较原系统在油耗和排放方面均有较大的改善。In order to achieve the purposes of energy saving and emission reduction, the traditional trailing suction hopper dredger was retrofitted from a diesel engine power system to a hybrid power system by simulation. The hybrid power system, using diesel and battery as the power sources, could adjust the operation mode according to different power demand and the state of charge of battery with energy management strategy. The fuel consumption models and emission models were built in Matlab/Simulink environment. The results showed that the hybrid power system has significant improvement in fuel consumption and emission compared with the original system.

关 键 词:混合动力 节能减排 能量管理 

分 类 号:U664.81[交通运输工程—船舶及航道工程] U674.31[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象