检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:章征涛[1,2] 刘伟庆[1] 王曙光[1] 左江 夏长春 樊嵘
机构地区:[1]南京工业大学土木工程学院,南京211816 [2]南京建筑设计研究院有限责任公司,南京210014
出 处:《建筑结构》2017年第8期87-92,共6页Building Structure
摘 要:宿迁海关大楼采用组合隔震技术,隔震层设置在地下室顶板和首层之间,结构主体17层,属于高层隔震建筑。主要阐述了主体结构的设计、隔震元件的选取与布置、隔震层相关构造以及隔震结构的计算分析。结果表明,相比传统抗震结构,采用组合隔震技术能显著降低上部结构的地震作用,上部结构可按降低1度进行常规设计,经济效益显著。Suqian Customs Building project adopts base-isolation technology,and isolation layer is arranged between the basement roof and the ground floor.The main structure has 17 stories and belongs to high-rise isolated building.The structural design of the main structure,selection and arrangement of isolation components,related structure of isolation layer and computational analysis of isolation structure were mainly described.Compared with traditional seismic-resistant structures,using the hybrid base-isolation technology will reduce the seismic responses of upper structure significantly.The seismic fortification intensity of isolated structures can adopt minus 1 degree,and the economic benefits are remarkable.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145