检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]郑州铁路职业技术学院,郑州450052 [2]北京铁路局北京供电段,北京100032
出 处:《高速铁路技术》2017年第3期28-31,共4页High Speed Railway Technology
摘 要:根据机车过分相过程产生铁磁谐振过电压,造成车顶绝缘子被烧坏、放电间隙被击穿等现象,研究机车过分相过程产生过电压的原因。运行经验表明,机车进入电分相时切断主断路器,网侧高压系统仅有高压互感器、受电弓等与接触网有电气的连接。通过建立机车过分相时牵引网与机车电压互感器的等效模型并利用PSCAD/EMTDC进行仿真,并提出加装RLC装置抑制过电压。仿真结果表明:机车过分相时高压互感器产生的铁磁谐振过电压高达93.42 k V,加装RLC装置后电压幅值为59 k V,电压幅值明显降低,减少了过电压对电气化铁路的危害,保证其安全运行。As the phenomenon such as the locomotive roof insulator is burnt out and the discharge gap is broken down due to ferroresonance over-voltage generated during locomotive passing neutral section process, the reason of over-voltage occurrence is studied. Operating experience shows that the locomotive passing neutral section cut off the main circuit breaker, only high-voltage transformer, pantograph, etc. of the high-pressure system at the network side has electrical connection with the catenary. By building equivalent model of traction network and the locomotive voltage transformer when locomotive passing neutral section, making simulation with PSCAD/EMTDC and adding RLC device to suppress the overvoltage. The simulation results show that the ferroresonance overvoltage of the high voltage transformer is 93. 42kV when the locomotive passes the neutral section, and the voltage amplitude is 59kV after the installation of the RLC device, the voltage amplitude is obviously reduced, which reduces the harm of overvoltage to the electrified railway and ensures its safe operation.
分 类 号:U224.24[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28