检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄淮学院建筑工程学院,河南驻马店463000
出 处:《工程建设与设计》2017年第11期219-222,共4页Construction & Design for Engineering
基 金:2016年驻马店市科技发展计划项目(16307)
摘 要:随着新型城镇化的推进,PPP模式的引入为社会资本参与基础设施和公共服务项目提供了一个可靠的渠道。但是,在PPP项目的实施过程中存在着诸多风险,对存在的风险进行准确识别、分析及评价就显得尤为重要了,运用科学的方法对存在的风险进行定性与定量的分析及评价,为实现风险的有效控制奠定基础。Along with the advancement of new urbanization, the introduction of PPP mode provides a reliable channel for the social capital to participate in infrastructure and public services. However, there are a lot of risks in the process of the PPP project implementation, accurate identification, analysis and evaluation is particularly important for the risk,make a qualitative and quantitative analysis and evaluation for the risks using the scientific method. The case can lay the basis in order to achieve the effective control of the risk.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15