广东地区110 kV~220 kV输电线路带电作业成本分析及建议  

Cost Analysis of Hot-Line Work of 110 kV~220 kV Transmission Line in Guangdong Area

在线阅读下载全文

作  者:王磊[1] 

机构地区:[1]广东电网公司应急抢修中心,广东广州510160

出  处:《企业技术开发》2017年第9期120-123,共4页Technological Development of Enterprise

摘  要:目前,广东地区普遍存在输电线路带电作业业务需求量大、带电作业定额偏低造成施工队亏损等情况,导致带电作业工作开展困难。文章通过对广东地区110 kV^220 kV输电线路带电作业进行实际成本测算,分析广东地区输电线路带电作业取费现状和存在问题,提出广东地区输电线路带电作业建议,希望能够推动广东地区输电线路带电作业发展。At present,there are many problems in Guangdong area,such as large demand for electrified line working,low demand for live working and loss of construction team, which leads to difficulties in live working.This thesis calculated the actual cost of live working on 110 kV - 220 kV transmission line in Guangdong area, analyzed the current situation and existing problems of live working charge on Guangdong power transmission line, and put forward some suggestions, hoping to promote the development of live working on transmission line in Guangdong area.

关 键 词:广东地区 输电线路 带电作业 成本 

分 类 号:TM84[电气工程—高电压与绝缘技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象