检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王磊[1]
机构地区:[1]广东电网公司应急抢修中心,广东广州510160
出 处:《企业技术开发》2017年第9期120-123,共4页Technological Development of Enterprise
摘 要:目前,广东地区普遍存在输电线路带电作业业务需求量大、带电作业定额偏低造成施工队亏损等情况,导致带电作业工作开展困难。文章通过对广东地区110 kV^220 kV输电线路带电作业进行实际成本测算,分析广东地区输电线路带电作业取费现状和存在问题,提出广东地区输电线路带电作业建议,希望能够推动广东地区输电线路带电作业发展。At present,there are many problems in Guangdong area,such as large demand for electrified line working,low demand for live working and loss of construction team, which leads to difficulties in live working.This thesis calculated the actual cost of live working on 110 kV - 220 kV transmission line in Guangdong area, analyzed the current situation and existing problems of live working charge on Guangdong power transmission line, and put forward some suggestions, hoping to promote the development of live working on transmission line in Guangdong area.
分 类 号:TM84[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15