检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]昆明理工大学,昆明650500 [2]北京中昌工程咨询有限公司,北京100021
出 处:《价值工程》2017年第32期38-39,共2页Value Engineering
摘 要:地铁的出现,在一定程度上减轻了交通压力。地铁工程与一般的建筑工程有所不同,其工程造价过高很大程度上限制了地铁的发展,所以要通过对工程预结算进行控制从而达到对工程整体成本控制的目的^([1])。为更好地降低地铁工程的施工成本,提高项目的经济效益,本文主要对近年来国内外地铁项目工程预结算过程中存在的主要问题进行了深入研究,并找出有效的解决措施^([2])。The emergence of the subway alleviates the traffic pressure. The subway project is different from the general construction project, and the high cost restricts the development of the subway, so we should achieve the purpose of controlling the overall cost of engineering through the control of budget and settlement. In order to reduce the construction cost of subway engineering and improve the economic benefits of the project, this paper mainly studied the main problems in the budget and settlement process of the recent subway project at home and abroad and found effective solutions.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117