检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《高速铁路技术》2017年第5期39-42,共4页High Speed Railway Technology
摘 要:机车过锚段关节式电分相出现电弧会产生过电压,使设备绝缘、机车和人身安全等受到巨大威胁。本文分析了机车过分相过程中产生电弧的四个位置,并绘制了其等效电路。并通过PSCAD/EMTDC仿真软件对机车过分相过程进行仿真建模,研究过分相过电压的产生机理,提出在中性线与钢轨间加装并联电容抑制过电压的措施,结果表明安装抑制装置后过电压最大幅值降低,抑制效果明显。The overvoltage of arc arrester is produced when electric locomotive passes the electrical sectioning with insulated overlap,making the insulation of the equipment,the safety of locomotive and person in great danger. In this paper,it is analyzed the four positions and causes of arc when electric locomotive passes neutral section and the equivalent circuit is drawn. The simulation model is established by PSCAD/EMTDC simulation software,and the process of locomotive over-phase is simulated. The purpose of this research is to study the mechanism of production of overvoltage when electric locomotive passing the electrical sectioning and suppression measures that install parallel capacitors between neutral and rail is put forward. As a result,the maximum amplitude of the overvoltage is reduced after installation of the suppression device.
分 类 号:U225.7[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28