检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国中铁二院工程集团有限公司,四川成都610000
出 处:《铁路工程技术与经济》2017年第6期20-23,共4页Railway Engineering Technology and Economy
摘 要:随着铁路建设的发展,所建项目不断增多,有的经过山区地热高温地段,不但影响到隧道施工安全和效率,也给施工组织和所需费用的确定带来困难。此文以玉蒙铁路旧寨隧道地热高温段为例,从施工组织设计入手,来探讨采取的施工防护措施和降温措施,并对需要增加的相关费用进行分析。With development of railway construction, the projects are increasing constantly. Some railways pass through the geothermal high temperature area in mountain area, which not only affect the safety and efficiency of tunnel construction, but also bring difficulties to construction organization and determination of required costs. Taking the Jiuzhai tunnel of Yuxi - Mengzi railway as an example, the design of construction organization is analyzed in this paper to explore the construction protection measures adopted and measures to cool down. And the increased related costs are analyzed.
分 类 号:U455[建筑科学—桥梁与隧道工程] F283[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.59.124