玉蒙铁路旧寨隧道地热段施工组织及相关费用分析  被引量:3

Analysis of Construction Organization and Related Expenses of Geothermal Section of Jiuzhai Tunnel of Yuxi-Mengzi Railway

在线阅读下载全文

作  者:张路刚 李准 

机构地区:[1]中国中铁二院工程集团有限公司,四川成都610000

出  处:《铁路工程技术与经济》2017年第6期20-23,共4页Railway Engineering Technology and Economy

摘  要:随着铁路建设的发展,所建项目不断增多,有的经过山区地热高温地段,不但影响到隧道施工安全和效率,也给施工组织和所需费用的确定带来困难。此文以玉蒙铁路旧寨隧道地热高温段为例,从施工组织设计入手,来探讨采取的施工防护措施和降温措施,并对需要增加的相关费用进行分析。With development of railway construction, the projects are increasing constantly. Some railways pass through the geothermal high temperature area in mountain area, which not only affect the safety and efficiency of tunnel construction, but also bring difficulties to construction organization and determination of required costs. Taking the Jiuzhai tunnel of Yuxi - Mengzi railway as an example, the design of construction organization is analyzed in this paper to explore the construction protection measures adopted and measures to cool down. And the increased related costs are analyzed.

关 键 词:铁路建设 地热高温 隧道 施工组织 增加费用 

分 类 号:U455[建筑科学—桥梁与隧道工程] F283[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象