检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭红卫[1]
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《铁道标准设计》2018年第1期133-137,141,共6页Railway Standard Design
摘 要:铁路电力贯通线长距离输电存在一系列问题,如在线路轻载时末端电压升高,重载时末端电压下降,严重情况下末端电压将超出允许范围,严重影响供电的可靠性和安全性,影响行车安全。对临河至策克铁路互做布其35k V变电所与额济纳35k V变电所间超长距离贯通线进行分析,提出并联电抗和串联电容相结合的补偿方案,建立仿真模型,分别对集中补偿方案和分散补偿方案的有效性进行验证。结果表明:提出的补偿方案能够很好地解决铁路电力贯通线长距离输电时存在的问题。There are a series of problems in the long-distance transmission of power transmission lines.For example,the terminal voltage increases when the load is low,while the terminal voltage drops when the load is high. This seriously affects the reliability and security of the power supply and traffic safety.This paper analyzes the super long-distance high-voltage power line along the railway of Linhe-Ceke between Huzuobuqi 35 k V transformer substation and Ejina 35 k V transformer substation and proposes a compensation scheme combining the parallel reactance and the series capacitor. A simulation model is established to verify respectively the effectiveness of the centralized compensation scheme and the decentralized compensation scheme. The results show that the compensation scheme proposed in this paper can better solve the problem of long-distance transmission.
分 类 号:U223.6[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15