检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州省交通规划勘察设计研究院股份有限公司,贵阳550081
出 处:《路基工程》2018年第1期220-224,共5页Subgrade Engineering
摘 要:倾倒变形是河谷地区层状岩质边坡失稳的一种典型变形破坏方式,是西南地区高速公路建设中不可忽视的工程地质问题。针对惠罗高速公路罗甸互通施工过程中AK2+910.000~BK0+382.283段左侧边坡发生倾倒拉裂变形,通过地质结构分析及理论计算,进行了边坡倾倒变形机理研究。在此基础上,提出了"以抗滑桩固脚+放缓边坡及加强边坡排水"的综合治理措施,治理工程实践表明,措施合理有效,边坡变形趋于稳定。The toppling deformation is a typical deformation damage form for the instability of layered rock slope in the valley area, which is the engineering geological problem that cannot be neglected in the construction of the southwest expressway. Aiming at the toppling and tension deformation of the left slope of AK2 + 910. 000 - BK0 + 382. 283 section in the construction process of Luodian interchangeable threedimensional intersection of Huishui--Luodian expressway, the mechanism of slope toppling deformation was studied by geological structure analysis and theoretical calculation. On this basis, the paper puts forward the comprehensive control measures of "anti-slide piles + slowing slope and strengthening slope drainage", which is proved reasonable and effective by the control engineering practice and the slope deformation is tend to be stable.
分 类 号:U416.14[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74