检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭莲娜 GUO Lianna(Bailianhe Pumped Storage Hydropower Co. , Ltd. , State Grid Xinyuan Co. , Ltd. , Luotian 438600, Chin)
机构地区:[1]湖北白莲河抽水蓄能有限公司,湖北罗田438600
出 处:《水电与新能源》2018年第3期65-67,共3页Hydropower and New Energy
摘 要:工程建设项目档案是水电建设工程的重要组成部分,也是达标投产、创优质工程的重要考核内容。由于水电建设工期较长,参建单位多,涵盖面广,给工程建设项目档案归档造成一定的难度,建设单位需通过采用合同控制、第三方监督、档案制度建设、目标奖惩等管理手段和措施,保障工程建设档案的系统、完整和准确。Archive of the construction documents is an important part of the construction work of hydropower projects,which is also an important examination content for the project acceptance and the high quality project evaluation.However,the filing of construction documents for hydropower projects is of certain difficulties,as the hydropower project construction is usually of long period,large number of construction units and wide coverage.To ensure the systematic,complete and accurate filing of the construction documents,management measures such as contract control,third party supervision,construction of document filing system,and reward and penalty principles should be implemented for the construction units.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28