检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:寇嘉玮 董增川[1] 周洁[1,2] 朱振业 张翔宇[3] KOU Jiawei1 , DONG Zengchuan1 , ZHOU die1,2, ZHU Zhenye1, ZHANG Xiangyu3(1. College of Hydrology and Water Resources, Hohai University, Nanfing 210098, China; 2. Zhefiang Huadong Engineering Digital Technology CO. , LTD , Hangzhou 311100, China; 3. Yellow River lnstiute of Hydraulic Research, Zhenzhou 450003, Chin)
机构地区:[1]河海大学水文水资源学院,江苏南京210098 [2]浙江华东工程数字技术有限公司,浙江杭州311100 [3]黄河水利科学研究院,河南郑州450003
出 处:《水资源与水工程学报》2017年第6期145-150,157,共7页Journal of Water Resources and Water Engineering
基 金:全国重点地区洪水风险图编制项目(江苏省)(20158028006)
摘 要:为了加强洪泽湖地区洪水风险管理,保障淮河下游防洪安全,采用WebGIS与水文学、水力学模型相结合,将一、二维耦合的水动力学模型内嵌于B/S系统进行洪水预报预警的方法。构建了一维洪泽湖地区河道、二维洪泽湖湖面及周边滞洪区相耦合的洪水演进模型,在此基础上开发了基于WebGIS的洪泽湖地区洪水预报预警系统,实现了对降雨、洪水进行实时监控、预报和对预警关注地点水位、流量变化、洪水淹没和超标洪水预警信息的可视化展示。系统进一步提升了洪泽湖地区的防洪数字化水平,可为避险减灾提供决策支持。In order to strengthen the flood risk management of Hongze Lake area and ensure the flood control safety of the lower reaches of Huaihe,by combining Web GIS with hydrology and hydrodynamic model,a 1D-2D coupled hydrodynamic model is embedded into the B/S system to forecast and warn flood. A 1D river,2D lake and detention basin coupled flood routing model was built,on this basis,the flood forecasting and warning system of the Hongze Lake area is developed based on Web GIS. The rainfall and flood can be real-time monitored and forecasted,the water level and flow changes at the concerns,with the flood risk and over-level flood warning information can be visualized. The system further improved the digital level of flood control of the Hongze Lake area,and can provide decision support for emergency escape and disaster reduction.
关 键 词:洪水预报 洪水演进模型 一维—二维耦合 WEBGIS 预报预警系统 洪泽湖
分 类 号:TV122[水利工程—水文学及水资源] X43[环境科学与工程—灾害防治]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38