检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国铁道科学研究院通信信号研究所
出 处:《铁道通信信号》2018年第3期17-20,共4页Railway Signalling & Communication
摘 要:信号系统联调联试期间,需要采用不同型号的车载设备对列控系统地面设备进行跨线兼容性测试。由于该测试处于联调联试的后期,给问题的整改、测试的时间安排带来一定的困难。本文根据联调联试的经验,总结归纳近年来CTCS-2级列控系统跨线兼容性测试过程中出现的典型问题,并对原因进行了深入分析,为线路信号系统的设计、施工提供一定参考。During integrated commissioning and testing of railway signal system, it is necessary to carry out cross-line compatibility test for train control system with different types of on-board equipment. Since this test is in the later stage of integrated commissioning and testing, if the ground problems are found, the time arrangement will bring some difficulties to the rectification and testing. Based on test experience, this paper summarizes typical problems in cross-line compatibility testing of CTCS-2 train control system in recent years, and gives the thorough analysis of reasons, which may provide certain reference for signal system design and construction.
关 键 词:列控系统 联调联试 CTCS-2级 跨线 兼容性测试 分析
分 类 号:U284.48[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28