检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐彩彩 XU Cai-cai(China Railway Design Corporation,Tianjin 300251, China)
出 处:《铁道标准设计》2018年第4期26-29,共4页Railway Standard Design
摘 要:无缝线路设计是轨道设计的关键问题之一。主要研究分析巴基斯坦拉合尔市橙线无缝线路设计方案,同时为国外高温地区无缝线路设计提供参考。橙线线路主要以高架线形式敷设,桥梁结构以U形简支梁为主。拉合尔地区整体气温偏高,历年最高气温47.4℃,橙线铺设普通区间无缝线路。通过理论计算与有限元分析,对钢轨强度与稳定性、桥梁墩台受力、钢轨断缝、轨缝值设置等进行了分析计算。研究表明:橙线高架线及地面线设计锁定轨温取(35±5)℃,轨缝值取8 mm是合适的,同时提出伸缩调节器的设置建议。Continuously welded rail design is one of the key issues in track design. The continuously welded rail design scheme of the Orange Line project in Lahore,Pakistan is analyzed to provide reference for other similar projects. The most part of the orange line is elevated and the bridge structure is dominated by U-shaped simply supported beam. The overall temperature of the Lahore area is high,and the maximum temperature is 47. 4 ℃. Ordinary continuously welded rail is laid on the line. Through theoretical calculation and finite element analysis,the strength and stability of the rail,the stress of the bridge pier,the rail breakage and the joint gap values are analyzed and calculated. The results show that the designed stress-free temperature of 35 ± 5 ℃ is accepted on both elevated line and ground line,and the joint gap value of 8 mm is acceptable. Meanwhile,recommendations on setting up rail expansion device are put forward.
关 键 词:巴基斯坦 轨道交通 无缝线路 锁定轨温 轨缝 伸缩调节器
分 类 号:U213.9[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3