检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱珍 张科学[1,3,4] 袁红平[5] ZHU Zhen;ZHANG Kexue;YUAN Hongping(State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining & Technology(Bering) , Beijing 100083, China;School of Mechanics and Civil Engineering,China University of Mining and Technology( Beijing ) 100083 ,China;Beijing Tiandi-Marco Electro- Hydraulic Control System Co., Ltd., China Coal Technology and Engineering Group Corporation Ltd., Beijing 100013, China;Intelligent Control Technology Branch of China Coal Research Institute,Beijing lO0013,China;Shaanxi Ruineng Coal Co. ,Ltd. ,Yanan 727307,China)
机构地区:[1]中国矿业大学(北京)深部岩土力学与地下工程国家重点实验室,北京100083 [2]中国矿业大学(北京)力学与建筑工程学院,北京100083 [3]中国煤炭科工集团有限公司北京天地玛珂电液控制系统有限公司,北京100013 [4]煤炭科学研究总院智能控制技术研究分院,北京100013 [5]陕西瑞能煤业有限责任公司,陕西延安727307
出 处:《煤炭科学技术》2018年第3期25-32,共8页Coal Science and Technology
基 金:国家重点研发计划资助项目(2016YFC0600900);国家自然科学基金资助项目(51674265);中国博士后科学基金面上资助项目(2017M620955);中国煤炭科工集团科技创新基金资助项目(2017QN010)
摘 要:基于切顶卸压沿空留巷无煤柱开采技术原理,分析了切顶卸压沿空留巷碎石巷帮的形成机理,建立了沿空留巷围岩结构模型,明确了顶板岩层运动特征;通过结合现场实测数据分析了采空区矸石运动特征,提出了将矸石运动过程划分为两大阶段,即快速垮落阶段和缓慢压实阶段,揭示了在矸石不同运动阶段矸石与碎石巷帮支护结构相互作用关系;基于顶板岩层及矸石运动特征提出了"侧向动静结合、纵向伸缩让压"的碎石巷帮控制思路,同时针对不同煤层开采厚度开发了3种不同的碎石巷帮控制结构,形成了切顶卸压沿空留巷无煤柱开采技术碎石巷帮稳定性控制体系,并在现场进行了支护应用,取得了良好的应用效果。Based on the principle of gob-side entry retaining with roof cutting and pressure releasing,the formation mechanism of roadway side wall formed by gangue was analyzed,and the motion characteristics of the roof was discussed by establishing the structure model of surrounding rock. According to the field measured data,the process of the gangue movement was divided into two stages,including rapid collapse stage and slow compaction stage,and then,the interaction relationship between the gangue and the supporting structure at each stage was clearly obtained. Besides,a control ideal,combining static and dynamic in the horizontal direction and extensible at the vertical direction to relief pressure,was put forward to lateral supporting structure base on the motion characteristics of the roof and the gangue. At last,three different control structures were proposed in view of different mining height,and the control system was established,which has been proved to be of good practicality in engineering site.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222