大容量接触网钢柱基础地脚螺栓预埋和精度控制  被引量:9

Pre Embedding and Precision Control of Anchor Bolts for Steel Column Foundation of Large Capacity Contact Network

在线阅读下载全文

作  者:陈志涛[1] 

机构地区:[1]哈尔滨铁路局滨洲铁路电气化改造工程建设指挥部,黑龙江哈尔滨150006

出  处:《铁路工程技术与经济》2018年第3期28-31,共4页Railway Engineering Technology and Economy

摘  要:在铁路电气化改造工程中,有的地段需要采用大容量接触网钢柱,如果其基础地脚螺栓预埋产生偏移或精度不够,将会影响大容量钢柱的组立和施工效率。此文以滨洲铁路电气化改造工程为例,探讨大容量接触网钢柱基础地脚螺栓的预埋和精度控制问题。Large capacity catenary steel columns need to be used in some sections of the railway electrification trans- formation project. And the pre embedding and precision control of foundation bolts will affect the forma- tion and construction efficiency of large capacity steel columns. Taking the electrification engineering of Haerbin - Manzhouli railway as an example, the problem of pre embedding and precision control of an- chor bolts for steel column foundation of large capacity catenary is analyzed.

关 键 词:铁路电气化 大容量接触网钢柱基础 地脚螺栓 预埋和精度控制 

分 类 号:U227[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象