城镇泥石流综合治理效果评估——以四川黑沙河沟泥石流工程为例  被引量:6

Analysis on effectiveness of urban debris flow control works:a case study at Heishahe Gully

在线阅读下载全文

作  者:张勇 陈宁生[2] 胡桂胜[2] 李俊 ZHANG Yong;CHEN Ningsheng;HU Guisheng;LI Jun(Graduate University of the Chinese Academy of Sciences, Beijing 100049, China;Key Laboratory of Mountain Hazards and Land Surface Process, Institute of Mountain Hazards and Environment, CAS, Chengdu, Sichuan 610041, China)

机构地区:[1]中国科学院大学,北京100049 [2]中国科学院水利部成都山地灾害与环境研究所山地灾害与地表过程重点实验室,四川成都610041

出  处:《中国地质灾害与防治学报》2018年第2期9-15,共7页The Chinese Journal of Geological Hazard and Control

基  金:国家自然科学基金国际合作与交流项目:地震山区可持续经济社会发展系统模型(41661134012)

摘  要:城镇泥石流严重制约着我国山区的经济建设与发展,自20世纪80年代以来我国修建了大量的城镇泥石流综合治理工程,然而关于城镇泥石流综合治理工程的效果评估鲜有报道。黑沙河沟历史上泥石流灾害暴发频繁,危害严重,1980年左右在该流域采用工程措施与生物措施相结合治理方针,取得了显著的防灾减灾效果。本文以黑沙河沟泥石流综合治理工程为例,通过现场调查,遥感解译与模型计算相结合的方法,提出了城镇泥石流治理工程评估模式,并针对黑沙河沟泥石流治理工程评估了其综合治理效果。评估结果表明:第一,经过综合治理后,流域的集水面积从23.7 km2减小至11.4 km2,植被覆盖率较治理前增加了60%,泥石流松散物源量从1.878 3×107m3减小至2.03×106m3;第二,采用工程措施与生物措施综合治理的方式,有效地控制了黑沙河沟泥石流暴发的频率与规模,泥石流洪峰流量从62 m3/s减小为38.4 m3/s。The urban debris flow seriously restricts the economic construction and development of our country’s mountain area. Although a large number of urban debris flow comprehensive treatment engineering have been built since the 80 s,but few report of benefit evaluation about it. Heishahe Gully has a serious debris flow in its history. The way that combine engineering measures with biological measures is effective. So this paper takes this project as an example,through field investigation,remote sensing and model calculation,put forward the urban debris flow control project evaluation model. Then evaluating the effect of Heishahe ’project. The result as follows. Firstly,catchment area reduced from 23. 7 km2 to 11. 4 km2,the vegetation cover rate increased 60%,loose material reduced from 1. 878 3 × 107 m3 to 2. 03 × 106 m3 after controlled.Secondly,the frequency and scale of debris flow outbreak are effectively controlled by the comprehensive measure,the peak flow reduced from 62 m3/s to 38. 4 m3/s.

关 键 词:黑沙河沟 城镇泥石流 综合治理 效果评估 

分 类 号:P642.23[天文地球—工程地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象