检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯磊 杜佩仁[2] 李超 王小磊 FENG Lei;DU Peiren;LI Chao;WANG Xiaolei(Yunnan Power Grid Co. , Ltd. , Kunming 650000 Yunnan, China;Zhejiang University, Hangzhou 310027 Zhejiang, China;Hangzhou Hongsheng Electric Power Design Co. , Ltd. , Hangzhou 311121 Zhejiang, China)
机构地区:[1]云南电网有限责任公司,云南昆明650000 [2]浙江大学,浙江杭州310027 [3]杭州鸿晟电力设计咨询有限公司,浙江杭州311121
出 处:《电力大数据》2018年第3期7-14,共8页Power Systems and Big Data
摘 要:电网规划发展由原来的粗放型向集约化转变,这使得设备利用率对经济性影响显著。为了提高设备利用率,本文从提高最大负荷预测准确性的角度,在对现有负荷预测众多方法的归纳总结,以及对行业间典型日特征曲线的分析,引入了行业间负荷同时率的概念,提出了计及行业间同时率的分区最大负荷调整的方法。该方法提出了不同行业之间的负荷高峰时段也存在着差异,即通过行业间同时率对最大负荷预测值进行修正即能得到更为精确的最大负荷预测值。结合文末对线路理论需求的计算的算例表明,计及行业间同时率的最大负荷预测方法可以提升最大负荷预测的准确性,提升设备的利用率以及电力系统经济性运行效益。研究成果对配电网经济性运行具有较大的指导性意义。The development of power grid planning has changed from the original extensive to the intensive, which has made equipment utilization significantly affect economic performance. In order to improve the utilization rate of the equipment, this article has introduced the concept of simultaneous load of industries, from the perspective of improving the accuracy of maximum load forecasting, summed up in many existing load prediction method of induction, and the analysis of the typical daily characteristic curves between inter industries, and introduces the concept of inter industry load rate at the same time, A method for adjusting the maximum load of a subarea that takes into account the simultaneous rate between inter industries has been proposed. This method puts forward that there are also differences between peak load periods of different inter industries. That is to say, by modifying the maximum load forecast value through the inter industry simultaneity rate, a more accurate maximum load prediction value can be obtained. The calculation example of the theoretical demand of the line at the end of the paper shows that the maximum load forecasting method taking into account the simultaneous rate among industries can improve the accuracy of the maximum load forecasting, improve the utilization rate of the equipment, and the economical operation efficiency of the power system. The research results have great guiding significance for the economical operation of distribution networks.
关 键 词:最大负荷 负荷预测 同时率 行业间同时率 配电网
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30