检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谭元刚 王刚 张向东 赵莉 TAN Yuangang;WANG Gang;ZHANG Xiangdong;ZHAO Li(State Grid Chongqing Electric Power Company Customer Service Center,Chongqing 400023,China)
机构地区:[1]国网重庆市电力公司客户服务中心,重庆400023
出 处:《中国测试》2018年第6期109-114,共6页China Measurement & Test
摘 要:为提高多机励磁系统多输入、模型不确定、外部干扰条件下的鲁棒稳定能力,提出一种变增益反演自适应L_2鲁棒分散励磁控制(variable gain back-stepping adaptive L_2 robust decentralized excitation control,VGBADEC-L_2)方法,实现多机电力系统的分散励磁稳定控制和不确定参数自适应。3机励磁系统仿真测试结果表明:相对于固定增益控制方式,采用VGBADEC-L_2后,在短时接地故障状态下,端电压稳定时间由1.6 s减小为0.7 s,输电线功率波动次数由4次减少为2次;在负载突变状态下,端电压稳定时间由1.5 s减小为0.5 s,输电线功率波动由2次减少为1次,励磁幅值由3倍增加至5倍,电力系统的稳定控制能力得到提高。In order to improve the robust stabilization ability of the multi-machine excitation system under multi-input, uncertain mathematical model and external disturbance conditions, a method of variable gain backstepping adaptive L2 robust decentralized excitation control(VGBADEC-L2) is proposed, which realizes decentralized excitation stability control and uncertain parameters self-adaption. Simulation results of the threemachine excitation system show that, the stabilization time of the terminal voltage is reduced from 1.6 s to0.7 s, and the tie-line power fluctuation is decreased from 4 times to 2 times by comparing with the traditional fixed-gain control method, under short-time grounding fault conditions after adopting the VGBADEC-L2;under load sudden change conditions, the stabilization time of the terminal voltage is reduced from 1.5 s to0.5 s, the tie-line power fluctuation is decreased from 2 times to 1 time, and the excitation amplitude is improved from 3 times to 5 times, which improves the stabilization control ability of the power system.
关 键 词:电力系统 自适应分散励磁控制 反演设计 L2鲁棒控制 变增益 L2增益
分 类 号:TM73[电气工程—电力系统及自动化] TP273[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7