检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尚金光[1] 王宜军 杨益群[1] 黄勇[1] Shang Jinguang;Wang Yijun;Yang Yiqun;Huang Yong(C hengdu Institute of Surveying and Mapping Survey,Chengdu 610081,China;CRTB Digital Engineering Co.Ltd.Chengdu 610031,China)
机构地区:[1]成都市勘察测绘研究院,四川成都610081 [2]中铁天宝数字工程有限责任公司,四川成都610031
出 处:《城市勘测》2018年第3期139-143,共5页Urban Geotechnical Investigation & Surveying
摘 要:在有地面沉降的区域进行高速铁路建设时,施工沉降监测直接反映出的沉降量往往无法体现出其真实沉降量。通过研究基准点、工作基点和监测点的相对关系,按照时空内插模型将低频的起算基准数据加密与监测点周期一致,从而叠加区域沉降去除附加沉降得到真实沉降,为轨道平顺性评估分析提供可靠数据支撑。During the construction of the high speed railway in land subsidence area,the settlement of construction monitoring directly reflected is usually unable to represent its true settlement. By studying the relative relationship between the benchmark point,working point and monitoring point,encrypt the low-frequency benchmark data in according with monitoring points cycle with the time-spatial interpolation model,thus appending land subsidence and removing the additional settlement to obtain the real settlement,so as to providing authentic data for the evaluation and analysis of track regularity.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3