复杂环境下侧洞法三联拱隧道设计及沉降控制研究  

Research on Design and Set lement Control of Three Arch Tunnel Subsidence in Complex Environment

在线阅读下载全文

作  者:潘茜 王丽丽 Pan Qian;Wang Lili(,Foshan Rail Transit Design and Research Institute Co.,Ltd Foshan 528000,China;,Foshan Railway Investment Construction Group Co.,Ltd Foshan 528000,China)

机构地区:[1]佛山轨道交通设计研究院有限公司,广东佛山528000 [2]佛山市铁路投资建设集团有限公司,广东佛山528000

出  处:《广东土木与建筑》2018年第9期76-78,共3页Guangdong Architecture Civil Engineering

摘  要:为研究复杂环境下北京地铁十四号线平乐园站~九龙山站区间暗挖三联拱隧道地表沉降控制,采用有限元软件Plaxis进行了三联拱隧道施工工序数值模拟,通过定性分析,明确了各施工工序的沉降值,给出了开挖的分步最大沉降值及总沉降量,并与实测结果进行对比,吻合较好,可为其他类似工程提供参考。In order to study the three arch tunnel of Pingleyuan station-Jiulongshan station tunnel on No.14 line of Beijing metro subsidence control in complicated condition,simulation of the three arch tunnel construction process with the finite element sofiware,through qualitative analysis, defined the settlement value of the construction process, and gives the excavation step the maximum settlement value and the total set- tlement value,and compared with the actual measurements,the results were well. The research can provide a reference for other similar projects.

关 键 词:三联拱隧道 施工 沉降控制 数值模拟 

分 类 号:U231[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象