巴基斯坦PKM高速公路互通变速车道平面设计浅析  

A Brief Analysis of the Plan Design of Pakistan PKM Motorway Interchange

在线阅读下载全文

作  者:兰旭[1] 肖军[1] LAN Xu;XIAO Jun(CCCC Second Highway Consultant Co.,Ltd.,Wuhan 430056,China)

机构地区:[1]中交第二公路勘察设计研究院有限公司,武汉430056

出  处:《交通科技》2018年第5期32-36,共5页Transportation Science & Technology

摘  要:通过对高速公路互通变速车道设计方法及标准的对比分析,研究《AASHTO规范》与我国规范的差异。经过分析,《AASHTO规范》对变速车道长度的定义较中国规范复杂,在设计应用时,需参考主线及匝道设计车速,并且根据匝道平曲线要素对变速车道长度进行调整,设计过程更为动态灵活,同时设计方式也较为复杂。Based on the comparison and analysis of the design method and standard of highway interchange speed this paper. Thr AASHTO is mo of main line and between AASHTO and Chinese specification was studied in ough the analysis, it points re complex than the Chinese ramp and adjust the speed 1 signing applications, so the design process is out that the definition of speed change lane length in standard, and it is necessary to refer to the design speed ane according to the ramp plane curve elements when de more dynamic and flexible.

关 键 词:AASHTO 互通立交 变速车道 对比分析 

分 类 号:U412.352.1[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象