检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李健
机构地区:[1]南京市建筑安装管理处
出 处:《建筑》2018年第19期59-59,共1页
摘 要:Conditions of Contract for Construction, FIDIC, 1999现场进入权条款 ( 2.1 Right of Access to the Site )对FIDIC权利义务的表达如下。 2.1 P, ight of Access to the Site The Employer 1 shall give the Contractor right of access to, and possession of, all parts of the Site within the time ( or times ) stated in the Appendix to Tender. The right and possession may not be exclusive to the Contractor. If, under the Contract, the Employer is required to give ( to the Contractor ) possession of any foundation, structure, plant or means of access, the Employer 2 shall do so in the time and manner stated in the Specification. However, the Employer may withhold any such right or possession until the Performance Security has been received.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15