检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李华日 LI Huari(Jinan Railway Material Industry Group Company Limited,Jinan Shandong 25000)
机构地区:[1]济南铁路物资工业集团有限公司,山东济南250000
出 处:《北京测绘》2018年第11期1314-1317,共4页Beijing Surveying and Mapping
摘 要:近些年来,我国高速铁路里程不断增加,高速铁路网络逐渐完善,进一步促进了我国经济的平稳发展。但高速铁路在运营期间由于外界环境变化及人为等不利因素的影响会引起高铁桥涵和路基的沉降和变形,威胁高速铁路列车运行安全,并可能导致灾难性事故的发生。本文以某高速铁路济南段范围内轨道复测实践,探讨高速铁路轨道控制网复测技术,研究现场实际轨道控制网的布设、测量和应用,并对部分轨道控制网显著变化区段进行分析,以期为今后轨道控制网复测积累经验。In recent years, China's high-speed railway mileage is increasing, high-speed railway network is gradually improved, further promoting the stable development of our economy. However, the settlement and deformation of bridges, culverts and roadbeds will be caused by the adverse factors such as environmental changes and man-made factors during the operation of high-speed railway, which threatens the safety of high-speed railway train operation and may lead to catastrophic accidents. Based on the practice of track retesting in Jinan section of a high speed railway, this paper discusses the retest technology of track control network of high speed railway, and studies the layout, measurement and application of actual track control network in the field. In order to accumulate experience for orbit control network retest in the future, the significant changes of part of orbit control network are analyzed.
分 类 号:P258[天文地球—测绘科学与技术] P224
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145