检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钱斐斐[1] QIAN Fei-fei(Shanghai Aircraft Design and Research Institute,Shanghai 201210,China)
出 处:《价值工程》2017年第18期97-99,共3页Value Engineering
摘 要:在民用飞机研制过程中,研发工时的不确定性导致设计成本无法准确估计。为了设计经济的飞机,本文结合民用飞机电源系统的研发流程,提出了研发工时定额管理。通过研究定额制定的管理和设计流程、确立和分类定额对象、制定定额标准、制定研发工时的管理和考核流程、进行工时差异分析以及引入成长曲线,对民机研发工时的管理和考核。这种方法管理研发工时,可以合理地估计和控制设计成本,并保证设计工作的质量。As the uncertainty of R&D man-hours,R&D cost cannot be calculated accurately in the process of designing commercialaircraft.Based on Electronic Power System,R&D man-hour quota management is discussed to design economic airplane.The articleincludes making quota management organization&procedure,setting and classifying quota object,establishing quota criterion,making manhoursmanagement&procedure,hour variance and growing curve.This management can estimate and control R&D cost and make anassurance towards design work.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145