潍坊港西港区5000吨级航道防沙堤布置方案  

Layout of 5000 DWT channel breakwaters in Weifang West Port

在线阅读下载全文

作  者:杨晓松 高涛 梁文文 YANG Xiao-song;GAO Tao;LIANG Wen-wen(Shandong Provincial Communications Planning and Design Institute, Jinan 250031, China)

机构地区:[1]山东省交通规划设计院,山东济南250031

出  处:《水运工程》2017年第9期148-153,共6页Port & Waterway Engineering

摘  要:潍坊港西港区航道位于的小清河河口,泥沙淤积严重,制约潍坊港西港区的发展,需要修建5 000吨级航道。提出3个防沙堤平面布置方案,通过波浪、潮流、泥沙数模试验分析各方案的回淤量;然后从经济角度估算各方案的工程建设费用,计算各方案年度寿命周期成本,综合比选,确定最优方案为短堤方案。The5000DWT channel of Weifang West Port is located in Xiaoqing River estuary.Because of severe sedimentation,we design5000DWT channel with breakwaters to improve the development of Weifang West Port,and put forward three layout schemes.Based on the wave,tidal flow and sediment mathematical model,we analyze the amount of silting for each planning scheme,also calculate the engineering construction cost of each planning scheme.Based on the analysis of life cycle cost(LCC),we confirm the short dyke as the optimal scheme after the comprehensive analysis.

关 键 词:防沙堤 平面布置 航道回淤 数学模型 

分 类 号:U612[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象