沪通长江大桥钢梁制造标准化管理  被引量:1

Standardized Management for Steel Girder Manufacture of Hutong Changjiang River Bridge

在线阅读下载全文

作  者:钱国华 QIAN Guo-hua(Engineering Management Center,China Railway Corporation,Beijing 100038,China)

机构地区:[1]中国铁路总公司工程管理中心,北京100038

出  处:《世界桥梁》2018年第1期76-78,共3页World Bridges

摘  要:沪通长江大桥全长11.072km,其中钢结构桥梁长5 827m,全桥钢梁用钢量达2.5×105 t。为了保证钢梁制造和涂装施工质量,建设单位在钢梁制造中推行标准化管理。建立合格供应商名录;构建专业化施工团队和完善的制度体系;严格执行达标检查、焊接工艺评定、首件验收、日常检查和综合考评、信息化管理;实行钢梁制造厂自检、监理检查和第三方抽检三级质量管理。最终实现各项工作闭环管理、有序可控,保证了钢梁制造质量。The Hutong Changjiang River Bridge has a total length of 11.072 km,among which the steel bridge structure accounts for 5 827 m.The steel used to the whole bridge weighs 2.5×10 5 t.To ensure the manufacture and coating quality,the companies that are in charge of the construction implements standardized management in the manufacture of the steel girder.The specific management items include the followings:to establish the list of the suppliers;organize the specialist construction teams;rigorously execute the compliance check,welding technique evaluation,first piece acceptance,routine inspection and comprehensive examination and computerized information management;to implement the three-grade quality management of factory inspection,supervisor inspection and the third party sampling inspection.The intension of the management is to realize the closed-loop management and ordered control of all the works,to ensure the manufacturing quality of the steel girder.

关 键 词:公路铁路两用桥 钢梁 制造 达标检查 焊接工艺 首件验收 信息化管理 三级质量管理 

分 类 号:U448.121[建筑科学—桥梁与隧道工程] U445.472[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象