检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢童安 罗丽荷 XIE Tong-an;LUO Li-he(Faculty of Civil Engineering and Mechanics,Kunming University of Science and Technology,Kunming 650093,China)
出 处:《价值工程》2018年第11期87-89,共3页Value Engineering
摘 要:人工挖孔扩底桩属于埋置较深的地下隐蔽工程,其施工技术存在较大的危险性,故而加强对人工挖孔扩底桩施工过程中的稳定性和安全性控制成为亟需解决的一道难题。本文结合实际工程总结了人工挖孔扩底桩稳定性控制的传统方法和特点,提出了基于BIM技术的人工挖孔扩底桩稳定性控制的具体方法及主要内容,阐述了其优势及实施要点,最后对其拓展运用进行了展望。How to control the strengthening of the stability and safety in the construction of the artificial hole dug belled pile is a difficult problem that it needs to be solved urgently,for the artificial hole dug belled pile belongs to the buried deep concealed project,and its construction technique is full of great danger.In this paper,the traditional methods and characteristics of the controlling of stability of the artificial hole dug belled pile are summarized for the comparing,some concrete methods and main contents of the controlling of the stability of the artificial hole dug belled pile is put forward based on BIM Technology,and its advantages and main points of implementation are expounded,finally the development and application of this method is prosected.
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.180