检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程铁杰 CHENG Tie-jie(School of Civil Engineering/Hefei University of Technology,Hefei 230009,China)
机构地区:[1]合肥工业大学土木与水利工程学院,安徽合肥230009
出 处:《山东农业大学学报(自然科学版)》2018年第1期66-71,75,共7页Journal of Shandong Agricultural University:Natural Science Edition
摘 要:基于级数理论,通过建立调洪演算数学模型,提出一种水库固定历时削峰方法,并通过实际算例进行验证。结果表明:水库可以在固定历时拦蓄洪水并及时下泄,经水库调蓄后洪峰被削减,洪水过程线更加平稳,下泄水量满足下游河道安全要求。该方法不仅为水库调洪演算提供了新的思路,也为水库的防汛调度相关问题提供一种可行简便的解决途径。Based on the theory of series,by establishing the flood regulating calculation mathematical model,a method of reservoir fixed diachronic peak clipping is proposed and verified by practical example.The results showed that the reservoir can be dominant floods at fixed diachronic and timely discharge flood.After being cut peak flood storage reservoir and flood hydrograph more smoothly,released water meet the safety requirements of downstream river.The results show that the reservoir can block the flood in fixed duration and discharge it in time,after the reservoir storage is adjusted,the flood peak is reduced and the flood hydrograph is smoother,water discharged meets the safety requirements of the downstream river channels.The proposed methods not only provides a new way for flood routing through reservoir,but also provides a feasible and convenient solution to solve the issues related to reservoir flood control and scheduling.
分 类 号:TV697.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7