检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康政[1] 房玉中[1] 陈晓成[1] 杨怀强[1] 叶勇[1] Kang Zheng;Fang Yuzhong;Chen Xiaocheng;Yang Huaiqiang;Ye Yong(The First Construction Division Co.,Ltd of China Railway Tunnel Group,Chongqing 401121,China)
出 处:《山西建筑》2018年第8期150-152,共3页Shanxi Architecture
基 金:中铁隧道集团一处有限公司科技创新计划项目(201708)
摘 要:结合工程实例,分析了小相岭隧道平导喷射混凝土超耗量大的具体原因,制定了相应的措施,并在现场进行了试验段对比。试验段结果表明:成功实现了降低小相岭隧道开挖施工中喷射混凝土超耗量。In this paper,com bined with the engineering exam ples,it analyzes specific causes of entra-large amount of concrete consumption in Xiaoxiangling tunnel flat guiding injecting process,the concrete measures are formulated and the comparison is made in the test section in the field.Experimental results show that the successful realization o f reducing the consumption o f shotcrete in the excavation of Xiaoxi&ngling tunnel.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.76