浅谈研制单位电镀工时定额管理  

Discussion on Man-Hour Quota of Development Type Enterprise

在线阅读下载全文

作  者:熊国刚[1] 曹银春[1] XIONG Guogang;CAO Yinchun(Institute of Machinery Manufacturing Technology,China Academy of Engineering Physics,Mianyang,621900,China)

机构地区:[1]中国工程物理研究院机械制造工艺研究所,四川绵阳621900

出  处:《电镀与精饰》2018年第9期35-39,共5页Plating & Finishing

摘  要:工时定额直接关系企业的任务规划、生产计划安排、考核分配、能力评估与资源配置,因此必须重视工时定额管理工作。本文系统分析了研制单位电镀车间生产现状,剖析了影响零件工时定额的几个原因,得出了制定工时定额的几个依据,推进了研制单位各项任务的顺利完成。Man-hour quota is directly related to the task planning,production arranging,employee per?formance evaluating,productive capacity estimating and resource managing of enterprise.Therefore,man-hour quota management should be taken into account.This paper analyzes the distinguishing fea?ture of development type enterprise.The man-hour quota method for development type enterprise is es?tablished by system considering the factors which impact the man hour quota.The research results pro?mote the task accomplishment of enterprise.

关 键 词:电镀 工时定额 质量管理 

分 类 号:F273[经济管理—企业管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象