检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李文广[1] LI Wenguang(The 5th Engineering Co.Ltd.of the 18th Bureau Group of China Railway,Tianjin 300459,China)
机构地区:[1]中铁十八局集团第五工程有限公司,天津300459
出 处:《国防交通工程与技术》2018年第6期77-79,共3页Traffic Engineering and Technology for National Defence
摘 要:为保证京沈客专工期,某施工标段采用CRTSⅢ型板式无砟轨道自密实混凝土冬季施工技术。介绍了该标段在施工自密实混凝土过程中,从原材料储存、运输过程、施工过程、成品养护四个方面所做的保温措施及温度监控工作。采用该工艺施工的CRTSⅢ型板式无砟轨道自密实混凝土经检测符合后续施工工艺要求,对类似工程有借鉴意义。To ensure the construction duration of the Beijing-Shenyang Passenger-oriented Railway,a certain construction contracted section adopts the winter construction techniques for self-densified concrete for Type-CRTS III slab non-ballasted tracks.Introduced in detail in the present paper are the temperature-maintaining measures taken and temperature-monitoring work done by the contracted section in the construction of the self-densified concrete in the process of storing raw materials,transporting,construction and curing the finished products.After being tested,the self-densified concrete for Type-CRTS III slab non-ballasted tracks built with the construction process is found to be in agreement with the requirements of the following processes in technology.The project may serve as a useful reference for other similar projects.
分 类 号:U213.244[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222