检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Hamid Mohebzadeh Amirmassoud Fathi Shahram Navabi Peiman Parisouj Alireza Nazari
机构地区:[1]Department of Water Engineering,Faculty of Agriculture,Bu-Ali Sina University,Hamedan 009881,Iran [2]Department of Civil Engineering,Roudehen Branch,Islamic Azad University,Roudehen 009821,Iran [3]Department of Civil Engineering,ERI,Gyeongsang National University,501 Jinju-daero,Jinju,Gyeongnam 606-701,South Korea [4]Tehran Water Supply and Water and Wastewater Treatment Company,Department for Supervision on Water Installations,Tehran 009821,Iran
出 处:《Journal of Earth Science and Engineering》2018年第3期93-102,共10页地球科学与工程(英文版)
摘 要:At semi-arid areas that dominant portion of required water for agriculture is provided by exploitation of groundwater,these resources encounter with more deterioration.Thus identifying of potential runoff generating sites and estimation of runoff depth can be a significant step for storing runoff for agricultural activities and groundwater recharge.The main purposes of this study are use of GIS(geographic information system)ability for identifying of potential runoff generating sites,and thus identifying high priority areas for groundwater recharge in the Gharehchay River watershed in the north of Hamedan province,Iran.Potential runoff generating sites were identified by using watershed features same as slope,land use and hydrological soil groups.Afterward,CN I(Curve Number I)technique,which is one of the eight derivations of the NRCS-CN(natural resources conservation services curve number)method,was utilized to calculate rainfall-runoff depth in the study region.Finally,map layers were ranked in order of highest priority to lowest priority,based on the criteria of each dataset,and high priority areas for groundwater recharge were identified by integrating potential runoff map,runoff depth and depth to groundwater maps.Spatial analysis revealed that 51%of the study region has a high priority for groundwater recharge.
关 键 词:GIS RUNOFF potential map RUNOFF depth estimation GROUNDWATER RECHARGE HIGH PRIORITY MAPS
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49