检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Structural Engineering and Technology Co. Ltd, Bucharest 021371, Romania
出 处:《Journal of Geological Resource and Engineering》2019年第1期17-31,共15页地质资源与工程(英文版)
摘 要:The paper deals with the construction works devoted to extending and upgrading the port functions to the highest European Standards. The Port of Giurgiu is located on the left bank of the Danube River, at the 493 km, and also at 65 km south of Bucharest, the Capital of Romania. Giurgiu is one of the Romanian largest Danubian Ports. Advanced computer programs were used in design. An active monitoring system, regarding the pre-existing constructions on the site, directly influenced by the excavations was also used. The adopted solutions for infrastructure were dependent by the monitoring results of construction site. The weak foundation conditions as well as the proximity of some existing buildings arouse unexpected obstacles difficult to overpass. However, by a perfect human cooperation all targets were finally reached.
关 键 词:Basin COFFERDAM DANUBE DEWATERING monitoring MOORING tri-modal terminal.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249