检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:封立伟 FENG Liwei(Dongying Environmental Protection Bureau/Dongying Total Pollutant Control Office,Shandong Dongying 257091,China)
机构地区:[1]东营市环境保护局/东营市污染物总量控制办公室,山东东营257091
出 处:《环境与可持续发展》2019年第1期97-99,共3页Environment and Sustainable Development
摘 要:本文以山东金岭化工股份有限公司大王镇污水处理厂二期项目为例,从项目概况、主要污染源及防范措施、污染物的监测状况等方面对城镇污水处理厂竣工环境保护验收监测作实例分析,并对项目环境保护提出了相关建议。Taking the second phase project of Dawangzhen Sewage Treatment Plant of Shandong Jinling Chemical Co.,Ltd as an example,this paper analyzes the completion and acceptance monitoring of environmental protection of urban sewage treatment plant from the aspects of general situation of the project,main pollution sources and preventive measures,and monitoring status of pollutants,and puts forward relevant construction for environmental protection of the project.After analysis on the second phase project of Dawangzhen Sewage Treatment Plant of Shandong Jinling Chemical Co.,Ltd,the study believes that environmental protection can be strengthened from the following three aspects.The first is to strengthen the sewage treatment plant facilities operation management and maintenance,do the responsibility to the people,to ensure the long-term stability of the pollutants in the waste water recycling standards;Secondly can further strengthen the plant greening,vegetation and seepage control;In addition,through continuous improvement of environmental monitoring technology,it can provide better technical support for environmental protection administrative departments and make contributions to local environmental protection work.
分 类 号:X21[环境科学与工程—环境科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3